Archive for the ‘Logistics’ Category

h1

Organization

July 24, 2009

We are living with our new kitchen now! Getting used to all the counterspace.
And getting used to our new systems of organization.

Why did it take us sooo long to get stuff back into the kitchen? We planned on all those cool, slide out Ikea drawer/shelves. Those take a lot of planning….. ‘What is the exact height for the cereal box shelf?’ etc.

There was alot of putting shelves in (which require screwing in the roller/tracky thingy for each) and taking shelves out. And there is a  heatwave of sorts going on in Seattle lately.

Anyhoo…. we got it all they way we think we like it…. will have to live with it for awhile to really know:

The pantry set up:

P1020239

Oh to have the Tupperware neatly stowed:

P1020241

P1020243

The cabinet above the fridge. Wine rack will eventually be filled with bottles:

P1020247

One of our 3 ‘junk’ drawers:

P1020248

Towels etc, and #2 ‘junk’ drawer:

P1020249

Advertisements
h1

We need a new fridge!

July 10, 2009

Well, we do not ‘NEED’ one, ours is only two years old.  We want a new fridge… a nice, stainless one (to match the other new appliances), that is perhaps counter depth (we need all the room we could get), side-by-side (also, for more room when doors are opened).

We moved our fridge into the kitchen and it just hit us like a ton of bricks…. It just sticks out too much (figuratively and really)!

We had to buy a new one 2 years ago because the old one that came with the house died. We were very limited in the type we could get because of the existing space in our old kitchen. And we selected white as to not commit to any color scheme. We always thought we would be fine with white appliances down the road…..

We had decided we did not need to spend the money on a fridge right now while remodeling the kitchen…’ Why? ours works fine!”

See below how it looks:

P1020208

P1020212

Oh well. Not that bad. It works, and we will eventually get one we reallly like.

We still LOVE our new digs…. Now we just have to put stuff in the kitchen  and start using it! We call it ‘the museum’ cause we just walk in and stare at it lots 🙂

h1

Not much happening…. but Happy 4th of July!

July 1, 2009

Our guy Rick came and put the duct work for the microhood/fan. Now it is vented out the roof.

We have started cooking with the new stove. We have been wanting eggs badly. Have not come up with a good way to have tasty eggs using just a microwave. Kyan LOVES what she calls ‘flat eggs’ (fried eggs, and she likes them ‘juicy’):

eggs on stove 2

We are just waiting now….. the countertops come in on July 7. Then the plumber will come and finish (install sink, faucet, disposal, dishwasher)… if he ever calls us back! Argh.

For whatever reason, the idea of putting everything back into the kitchen and re-organizing is something we keep putting off.  B and I need to spend some time deciding what should go where, and get some drawer inserts etc, and re-org the pantry shelves etc. We don’t really wanna do it, so we keep saying ‘when it is all done we will do it’.

In theory we can put off ‘being done’ until we get the backsplash done….which is up to us to do. And we have not even decided on the tile for sure yet. Hee hee

h1

Holiday Weekend??? Not for us!

May 27, 2009

We needed that loong 3 day Memorial Day weekend. We got lots done. Kyan stayed with her grandma. We missed her, but we are thankful to have had 3 full kid-free work days. Reminded us of our pre-kiddo days of doing projects.

Me and B are at our best together during projects… weird I know, but true. We are pretty proud of ourselves, oh and very tired too!

We got the ceiling completely painted, the room completely painted, the floor prepped  for tiling (which ended up being more work than we thought it would be), the dining room and living room walls re-painted, um…. seems like more that that.

I will post the pix in order as much as possible:

Here is the paint color. It is hard to see the color actually… we will have to try to scan a chip of it in. It is called Carolina Inn Club Aqua. It takes on different shades in different light…It is probably the most subtle paint color of any we have in our house. We debated going darker, but we both really like it.

P1020060

We took up a 1/2″ thick plywood layer from pretty much the whole floor. Hard work. Love our pry-bar! And treat of treats, we DID have some really ugly, yellow, 70’s vinyl floor under it afterall!

P1020036

P1020034

Ewwww. This is what was under one corner of the room where at one time the washing machine was. Yes, when we bought the house the washer and dryer were in the kitchen. What the..??!!! We moved those out first thing, but some damage had obviously been done:

P1020042

And under that lovlieness…. one plank of rotted subfloor:

P1020041

We cut out the rotted plank to reveal… our crawlspace:

P1020048

We were a little nervous at this point that we may have done something bad. We cut out the plank, but were not sure how to get it back in. The plank cut out was very old, tounge and groove…..so all those planks fit together. But thankfully we got a WONDERFUL, KNOWLEDGEABLE person at Lowes. We were worried we would get some part-timer who has never done real contractor work, but instead Gene met us at the door and explained just what we needed to do. And it worked! Thank you Gene!!! :

P1020050

One more layer of  3/4″ plywood to even it out with the existing floor:

P1020053

Hard to see here, but when we cut some of the rug back from the dining room, we discovered what the hardwood floors look like throughout the house. Not bad. Someday we will take up rug and refinish hardwoods…someday…..:

P1020056

We needed to add a bit of self-levelling compound to half the room to make it almost exactly level. It was not that bad, just a slight bit lower on west wall:

P1020064

So by day 3 (Monday) we started measuring, cutting and laying the cement backerboard. This took alot longer than we thought it would. We realized we are not so good at the exact measuring. So because of our mess ups, we had one more trek to Lowes on Monday for one more sheet of backerboard…DOH! :

P1020067

We are pretty proud fo this maneuver. How to cut backerboard around the pipes (which protrude a bit higher than the floor…not sure we love this set up by the plumber, but we can work with it….). Will be interesting to tile around this too:

P1020068

Mortaring under backerboard:

P1020070

By the end of the evening, had all the backerboard screws in. That was long and tiring, and our knees were hurting. We are soo glad we invested in some good knee-pads:

P1020073

We had hoped to get the seams mudded and taped, but did not. We will do that next weekend. We probably will not have the tiles till the end of next weekend or even later, so we will use this upcoming weekend to work on other stuff: paint touchups, window frame, rug/tile transitions, house and yard work.  Kyan really wants to be a part of the process…she asked to help us tile. We are trying to figure out how to involve her in some of those tasks.

We are proud of our work and were excited to get started on our part, but we were beat! And do realize the benefits to paying it done… well if money were no object of course 🙂

h1

Tilegate. Sort of.

May 18, 2009

We did end up finally picking our floor tile. It was probably the hardest part of this yet!

Bree went on her lunch to the fancy, artsy tile store in North Seattle to look for some tile samples. We had gone back and forth to this store over the last couple months, each time bringing home a board full of tile examples to test out at home. It is pretty inconvinient for us to get to, but we liked it.

Anyartsytileyhoo…. Bree was helped by the flowy, artsy staff member whose main mantra was “oh who cares about money”. Uh, we do! She and Bree picked out some good ones, and the lady tells B. that all of the samples are “anywhere around $5-$7 square foot”. That is in our range.

We go home with them, spend alot of time comparing and deciding on the perfect one, and were pretty happy to have made our decision. We are going back up there tomorrow morning (on our way to a North end bday party) to just purchase…done!

Well, not so much. The tiles she sent home, and the one we liked were actually $14 a square foot!! Not doing! Then three others we picked out at the store where that much. We were feeling pressed for time to go pick up Kyan at GramJ’s and B. was really mad at the artsy gal! We had to start all over again!

Soooo…. we walked out, and went to another store.  Ahhhh… much better feeling  there. And we started looking over again, this time demanding to know price before getting too attached. We found one that we liked better in the end. Don’t these things always work out just how they were supposed to!??

Here is the tile we picked. It is actually a little grayer, less brown than the pix shows. We wanted the long, 12×24 size that we will lay in a brick pattern:

P1020029

h1

Finally, we get to start feeling useful!

May 18, 2009

We got alot done this weekend. Well, Rick got alot done first, then we got to work.

Rick finished sanding and prepping the walls. He did awesome! His work is done for a little while (he will be back after cabinets put in to do the duct for the microhood).

We cleaned up all the dust (which was not that bad…love that we have a shop-vac!), and already primed the whole room:

P1020027

 What child labor laws????  Kyan helped out with the painting. She loved helping (we figured the primer step could be fun intro to painting for her):

P1020015

 We are really busy (with other stuff!) every evening this week, so this weekend we will paint color (once we decide on our color), and we will work on the window trim and preparing the subfloor for tiling. We like this part!

h1

Nothing lately, but starting up again…

May 15, 2009

Nothing has been done since last Sunday (May 11). Mud has dried, and today our buddy Rick will be back to do some more mudding, sanding etc.

He will be here tomorrow too.  Still needs to clean up the sub-floor. Just one patch needs replacing we think.

He asked us to put some primer up on the walls Sunday to be able to see any blemishes that may need repairing.

Bree and I have to decide on our floor tiles and start getting ready for that component.  Hard to decide!

Will post pix again soon.